| Executed contracts |
 |
Our executed contracts list:
|
„Biogran” GmbH – Skawina, ul. Piłsudskiego 1
- execution and assembly of air-conditioning and ventilation together with automatization,
- execution of power and lighting wiring in storehouse of ready goods,
- relocation of mechanical ventilation for hall of extraction batteries from II floor to roof of building,
- execution of ventilation pipeline on the floor of large spraying tower

|
ZPT - Philip Morris Polska Kraków, Al. Jana Pawła II 196
- designing, assembly, adjustment and starting:
- electric wiring in buildings: C,Q,F,K,G,J3,J,
- air conditioning and ventilating pipeline in buildings : C, Q, R,U1,J3,G,J2,
- pipeline of ice water in buildings: Q,C,J3,
- pipeline of heating water in buildings: C,Q,R,J3,
- pipeline of compressed air in buildings: C,J3,G,
- assembly of transformer station, low voltage cable network, internal wiring of: power, light, control, automatics, interior switch-board in new production hall- J2,
- assembly of cable network, internal box switch-board, electric wiring of power and light, control and automatics in production hall - L1,
- electric wiring of power, light and valve arresting wiring for Burley flavouring line, anti-explosive protection in building K
- assembly of transformer station, electric wiring of power, light and valve arresting wiring for Garbuio hall together with designs in buildings L / L1,
- service of switch-board and devices and electric wiring on the area of Philip Morris Polska,
- execution of fire signalling in building J,
- execution of emergency feeding system for Philip Morris Polska-Kraków plant,
- telephone and computer wiring,
- estimation of correctness in operation of ventilating, air conditioning, heating, water-supply, sewage, electric systems and automatics etc.
- monitoring installations for ventilation, air conditioning, heating, water-supply, sewage, electric, automatics, fire-control, access control systems etc.
- system of monitoring for CO2 installation in building J2,
- execution of heat pull-off pipeline for filtering machines in building G4,
- sanitary and industrial pipelines in buildings: Q, C, J3, S,
- service of air conditioning centres in buildings of PMP,
- service of technological installations, ventilation, air-conditioning, heating, cooling, electric and automatics systems etc.
- connection of compressed air, vacuum and feeding to process machine in building G4,
- reconstruction of the "kitchen of sauces and flavours” together with technological and electric wiring – together with design,
- building works in building J3
- execution of adaptation works in warehouse building in Poznań, assembly of aluminium fittings,
- adaptation of premises for wire broadcasting centre together with electric and teletechnic wiring,
- elaboration of design for fire-control signalling in Tobacco Production Hall,
- demolishing works in building J,
- execution of road, sidewalks and lawns,
- assembly of steel constructions in building J3,
- measuring of power-electric media in the frames of extension of BMS (Buildings Management System),
- design and assembly of devices for control of access together with connection to existing system, execution of configuration and visualization together with building works in building Q.

|
Airco Diet - New Jersey - USA
Works executed on the area of Philip Morris Polska S.A
- execution of electric wiring, wiring for feeding and logistics between interchanges

|
„Budostal 2” Kraków, ul. Lublańska 34
Works executed on the area of Philip Morris Polska S.A
- shift of cable between buildings L - J,
- assembly and disassembly of lighting poles, electric works on building L / L1,
- repair of earth electrodes for valve arresting wiring on buildings C, D, J, S,
- feeding of "SPARTA” stadium,

|
Johnson Controls Kraków, Mazowiecka 25
Works executed on the area of Philip Morris Polska S.A
- assembly of cable routes and arrangement of cables, execution of temporary control lines, BMS feeding
Works executed on the area of III Campus of Jagiellonian University
- electric and technological works.

|
„Siltec” Sp. z o.o. Warszawa ul. Orzeszkowej 5
- connection of new UPS’s - on the area of Philip Morris Polska S.A. in building G
- modernization of electric wiring connected with execution of warranted feeding system for Philip Morris Polska S.A.

|
C.T.G „Womar” Sp. z o.o. Kraków, ul. Skośna 12
„AUTEL” Trinec – Czech Republic
- complex execution of strong-power feeding of devices and lighting and arrangement of control and monitoring cables for work of base together with connection of sensors and object-oriented devices within the frames of task” enlargement of storage capacity in Reloading-Storage Base of Liquid Park on Chemików Pier in Commercial Port Świnoujście”.

|
CPN - Polish Oil Concern „ORLEN” Kraków, Al. Mickiewicza 45
Filling stations and warehouse bases:
- CPN Kraków - execution of water mains and sewage system, shift of medium-pressure gas grid,
- complex repair of buildings on the area of ZGPN in Nowy Targ: execution of roof construction together with covering, exchange of woodwork, construction of new premises, execution of oil boiler room, replacement of electric wiring, installation and building works together with design,
- execution of design and execution of wireless signalling - the Wola Rzędzińska,
- execution of concrete pavement together with water-sewer economy ( field sewage treatment plant) on the basis of oil products in Nowy Targ plus the design,
- assembly of oil separators
- execution of anticorrosive works for steel constructions of filling stations, replacement of roofings, execution of electric wiring of station together with electric boxes,
- execution of reinforced concrete barrier partition in fuel pumping station -Wola Rzędzińska,
- marking of technological routes and reservoirs - Wola Rzędzińska.
- repair of roofing material and replacement of shields in glow-worms on ZGPN Olszanica,
- cleaning and utilization of oil-derived waste from CPN filing station - on the area of Małopolska voivodeship and Southern Poland

|
Municipal Enterprise of Heat Energetics Kraków, Al. Jana Pawła II 188
- assembly of pre-insulated networks, complex execution of gas boiler rooms, assembly of compact interchanges, replacement of armature in thermal chambers, thermal insulation of exchanger room and chambers,
- repair of boiler room at Makuszyńskiego street and anticorrosive protection for dedusting of chimneys,
- anticorrosive works for flyover at Ujastek street,
- execution of technical documentation for automation of exchanger room with installation and execution of design,
- repair of premises and buildings of exchanger room,
- painting of boiler hall in boiler house at Makuszyńskiego street,
- anticorrosive protection of pipelines on flyover at Darwina street,

|
„Cermegad” Kraków
- execution of electric wiring of power and light together with feeding of production hall, assembly of construction, assembly of thermal insulation of ventilation channels

|
Community culture centre in Mydlniki
- repair of gas boiler room, transformer station with feeding 15 kV, low voltage cable network, external lighting, electric wiring of power and light inside the building.

|
|
 |
|
 |
 |
© Copyright PPHU Pormat 2004
 |
|
|
 |